Villains Land looks set to get a permanent service road at Magic Kingdom, built where the Rivers of America used to meet the park’s backstage service canal. New aerial photos show that old junction from above, next to a structure that once served as a service dock for the Liberty Belle riverboat.
Aerial photo of where Rivers of America used to connect with the Magic Kingdom service canal. Seems like a permanent service road for Villains Land will be built here. Structure near the arrow used to be a service dock for the Liberty Belle riverboat.
— bioreconstruct (@bioreconstruct) November 22, 2026
Why A Service Road Matters Here
The Rivers of America used to connect with the canal that runs along the back edge of Magic Kingdom, and the riverboat had its own service dock right at that junction. With the river and the boat gone, the connection has no job left to do, and the ground it occupied looks set to become a road instead.
That would give Villains Land a permanent backstage route for deliveries, maintenance crews and cast members, the kind of access every land needs once it opens. Right now the two construction sites already share one haul road, which runs from Piston Peak National Park to the Villains Land grading west of the Haunted Mansion, Blog Mickey reported from the same set of aerials.
A Wet Week On The Villains Land Site
Several days of heavy rain this week left parts of the Villains Land work site flooded, with standing water sitting in low spots across the graded ground.
Aerial overview of Villains Land construction. Much rain this week, areas of the work site are flooded.
— bioreconstruct (@bioreconstruct) November 22, 2026
The land itself is still in its earthwork stage. Crews have cut the hillside behind the Haunted Mansion back to bare earth, and the Villains Land site now has a graded basin with piles of pipe waiting to go into the ground. There is no vertical construction on this side yet, unlike next door, where the first walls of Cars Ridge Run Rally have started to rise.
3 aerial overviews of Villains Land construction.
— bioreconstruct (@bioreconstruct) November 22, 2026
What Comes Next For Villains Land
Villains Land and Piston Peak National Park are being built together as one giant project in the space left by the Rivers of America, Tom Sawyer Island and the Liberty Square Riverboat, all of which closed on July 7, 2025. Paperwork Disney filed in February says infrastructure work for both lands will be complete by 2028.
Paperwork has also been the best clue to what is coming on this side of the park. Earlier this month, a second new address near the Haunted Mansion turned up in construction records that could belong to Villains Land. At D23 in August, Disney revealed the land will be about the size of Star Wars: Galaxy’s Edge, with two attractions: a Maleficent coaster and a dark ride hosted by the Magic Mirror. Its story centers on a wishing well corrupted by an evil wish, which drew Disney’s villains to the forest around it. It has not announced an opening date.
For all the Disney news without the clickbait make sure to follow our accounts! Facebook | Twitter | Threads | Instagram | TikTok
